Why the slab edge matters
Subterranean termites move through soil, making the ground-to-building junction a key inspection area. Concealed entry can occur around the perimeter, through joints and through penetrations.
42.0%
34 of 81 published Morley reports recorded slab edges concealed by soil, paving or raised garden beds.
Source: SURE Building Inspections.
CSIRO recommends keeping soil and mulch below the slab and away from weep holes; a clear strip improves inspection visibility.
A well-kept home can still have important inspection areas hidden from view.








